Installation 1
3.2.9
Installation of Outdoor Unit
Foundation of Units
CU-5MX / MC
CU-8MX / MC
CU-10MX / MC
CU-8ME
CU-10ME
Notes:
1. Standard concrete mix: 1 cement / 2 sand / 4 gravel with 10 reinforcing rods (approx. 300mm intervals).
2. Mortar should be used to level the surface. The edge of the concrete surface should be bevelled.
3. When setting the foundation on a concrete floor macadam is not required but the surface of the
4. A drainage channel should be made around the foundation to cater for waste water around the
5. When installing a unit on the roof be sure to check the strength of the roof and pay special attention to
6. If the unit is to be installed on a frame, install the waterproofing board within a distance of 150mm under
CU-5MX / MC
40
Operational steps
Prepare foundation
Model
A
355
100
concrete should be broken up to make it uneven.
machinery.
waterproofing requirements.
the unit in order to prevent infiltration of water coming from under the unit.
Bolt pitch
Install outdoor unit
B
555
1200
CU-8·10MX / MC, CU-8·10ME
PACD011001G2 / PACD011004G3
(V1150)
Urban Multi Inverter "MX1" Series