Commissioning

5.1

General information for commissioning

Unintentional starting of the drive unit
Secure the drive unit to prevent it from being started up unintentionally.
Attach a warning notice to the start switch.
Risk of slipping on oil
Remove any oil spillage immediately with an oil-binding agent in compliance with
environmental requirements.
Checking the pressure breather valve
Check that the breather valve is activated.
If the breather valve has a transport fixture, it must be removed before commissioning.
Figure 5-1
Remove the transport fixture by pulling the securing clip ① in the direction of the arrow.
5.2

Checking the oil level prior to commissioning

Check the oil level before commissioning. Correct the oil quantity when required.
Siemens AG recommends a complete oil change after a storage time longer than 24 months:
• For gearboxes with long-term preservation.
• For gearboxes supplied completely filled with oil.
Please observe Checking and changing lubricants (Page 74).
BA 2030
Operating Instructions, 02/2021, A5E37880173A/RS-AM
WARNING
WARNING
Pressure breather valve with securing clip