IBM J15 Manual page 118

Cloud object storage system
Table of Contents

Advertisement

7. Reinstall the remaining parts into the enclosure, as described in the following topics. You can install
the parts in any order.
Important: Ensure that a mechanical lift is available and in place to support the additional weight as
the FRUs are reinstalled in the enclosure.
• "Installing or replacing a power supply " on page 57
• "Installing or replacing a drive" on page 25
• "Installing or replacing a secondary expander module " on page 54
• "Installing or replacing an expansion canister" on page 62
• "Installing or replacing a fan module" on page 63
• "Installing or replacing the top cover" on page 28
8. Reconnect the SAS cables, as described in "Removing and installing a SAS cable" on page 40.
9. Reconnect the power cables.
10. Firmware (FW) on an enclosure must be updated, and to do this attach a single SAS cable between
the rightmost SAS port on the rear of the controller and port 1 on the right-hand ESM of the Disk
Enclosure.
11. Log in to the nut shell on the controller Node and run the FW update command:
#enclosure firmware upgrade
After firmware update is complete check FW version by running the command:
#enclosure firmware versions
Expected output:
Element Type: enclosure
Element Identifier: primary
Description FW Revision
-------------------------------------------
SAS Expander Left 0EA4.official
SAS Expander Left(Bootloader) 000E
SAS Expander Right 0EA4.official
SAS Expander Right(Bootloader) 000E
SEM1 Expander 1 0EA4.official
SEM1 Expander 2 0EA4.official
SEM2 Expander 1 0EA4.official
SEM2 Expander 2 0EA4.official
12. Attach a second SAS cable to HBA and port two on the right-hand HBA.
90 IBM Cloud Object Storage System
Version 3.15.6: J15 Appliance Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5u92

Table of Contents