CHAPTER 3 Precautions Pertaining to Delivery and Installation
(2) Through-floor anchoring
Special leveling feet must be prepared separately to anchor a unit by using this
anchoring method.
Each leveling foot of a unit must be replaced with F6-DA6G when it is bolted
from the underside of the floor.
Figure 3.2 Earthquake-proofing construction method (through-floor
3-4
Unit
Leveling foot (F6-DA6G)
(Floor)
Bolt
anchoring)
C122-H001-02EN