CHAPTER 2 Connection Reference
b) PSU locations
Front view (with the door open)
ACS#2
ACS#3
*1
Figure 2.16 PSU locations in the PRIMEQUEST 480 with a dual power feed
2-24
Main unit
ACS#1
AC cable
Basic units
of dual power
feed option
Expansion
units (*1)
Two additional power supply units (MC-57PS11) need to be prepared if five
or more system boards or five or more I/O units are mounted.
When additional power supply units are not mounted, dummy components
are mounted in the relevant slots.
Extended power cabinet
Basic units
#A02
#A01
#A00
PSU
ACS#0
Expansion
Basic units
units (*1)
Components of
additional PSU
option
Expansion
units (*1)
#A05
#A08
#A04
#A07
#A03
#A06
#A09
Basic units
of dual
power feed
option
Expansion
Components of
units (*1)
additional PSU
Extended Power Cabinet
Rear view (with the door open)