Fujitsu PRIMEQUEST 480 Installation Planning Manual page 17

Hide thumbs Also See for PRIMEQUEST 480:
Table of Contents

Advertisement

CHAPTER 1 Installation Reference
1
This chapter provides the information required for installing the PRIMEQUEST 480/
440 server.
1.1
Equipment Configuration
Table 1.1 lists the units that comprise the PRIMEQUEST server and their
specifications. Figure 1.1 and Figure 1.4 show a sample system configuration.
Unit
PRIMEQUEST 480
main unit
PRIMEQUEST 440
main unit
Extended power
cabinet
Extended I/O
cabinet
PCI_Box
C122-H001-02EN
Table 1.1 Units and their specifications
Specifications
Unit that can contain up to eight system
boards (maximum of 32 CPUs) and up
to eight IO_Units
Unit that can contain up to four system
boards (maximum of 16 CPUs) and up
to four IO_Units
Power supply cabinet that is connected
to the PRIMEQUEST 480 main unit
for dual power feed configuration
Cabinet that contains PCI_Boxes and
that is connected to the PRIMEQUEST
480 or 440 main unit
Device used to expand the number of
PCI slots. 4 PCI unit can be added for
each addition of a PCI_Box.
Each PCI unit contains three PCI slots.
Up to eight units can be connected to
the PRIMEQUEST 480 main unit.
Up to four units can be connected to
the PRIMEQUEST 440 main unit.
Remarks
Standard equipment
Standard equipment
1-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 440

Table of Contents