Fujitsu PRIMEQUEST 480 Installation Planning Manual page 70

Hide thumbs Also See for PRIMEQUEST 480:
Table of Contents

Advertisement

CHAPTER 2 Connection Reference
b) PSU locations
Front view (with the door open)
*1
Figure 2.14 PSU locations in the standard PRIMEQUEST 480 configuration
(including a single power feed option and redundant power supply unit)
2-22
ACS#1
PSU
An additional power supply unit (MC-57PS11) needs to be prepared if five
or more system boards or five or more I/O units are mounted.
When an additional power supply unit is not mounted, a dummy component
is mounted in the relevant slot.
ACS#0
AC cable
Expansion
Basic units
units (*1)
Components of
additional PSU
Expansion
Basic units
units (*1)
#A02
#A05
#A08
#A01
#A04
#A07
#A00
#A03
#A06
#A09
Rear view (with the door open)
C122-H001-02EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 440

Table of Contents