6. S-Box Installation and Connection
• S-Box connection
⑩ Finishing the HDBaseT cable after installation
•
Fold and raise the drain wire above the RJ-45 connector. Use pliers to attach the deformation prevention parts together, as
shown below.
•
Soldering of drain wire to metallic part of RJ45 connector: Solder the drain wire to the metallic part of the RJ45 connector
and cut unnecessary parts out. Use a cable tester to the conductors and shield status (continuity).
Recommendation) Drain wire soldering + copper foil
48
LED R&D Lab(VD)