4. Frame Installation
※ Vertical frame extension
- Attach the Joint V (vertical) to the target frame for extension
Fasten M4
<Vertical extension>
When extending FRAME, it is easy to turn vertical and horizontal. Horizontal vertical CHECK must be extended.
(Laser Horizontal System/Sill etc.)
- Insert the joints of the additional frame into the existing frame. Insert jigs
to place the frames into position.
- After attaching the jigs, fasten screws between the frames.
M4 screw
1 mm
- Distance between connected frames for extension is 1 mm.