3-2. [Pivot] IER-F + IER-F Extension (Left to Right)
• Fasten the installed Frame F Pivot and two Frame F Pivots to install on the JIG.
• Align the JIG Stud with the JIG hole of the Frame. (without using the JIG screws)
• Fasten the Frame F Pivot to the wall with screws.
Fastening
• Install it again after repositioning. (Fig 7)
Screws
Installed Frame F
Pivot
Frame F to
Frame F Pivot
Install ②
to install ①
Frame F Pivot to
install ①
Fig 8. Frame F Extension (Left to Right)
Case ② Installation
Fig 7. Studs for Extension (Left to Right)
Fig 9. IER-F installed to the right of IER-F
117
LED R&D Lab(VD)