Ground Source Heat Pump; Performance Report - Bard QW Series Installation Instructions Manual

Geothermal r-410a staged capacity packaged heat pump
Hide thumbs Also See for QW Series:
Table of Contents

Advertisement

This performance check report should be filled out by installer and retained with unit.
DATE:
1. UNIT:
Mfgr
THERMOSTAT:
Mfgr
2. Person Reporting
3. Company Reporting
4. Installed By
5. User's (Owner's) Name
Address
6. Unit Location
WATER SYSTEM INFORMATION
7. Open Loop System (Water Well)
A. If Open Loop where is water discharged?
8. The following questions are for Closed Loop systems only
A. Closed loop system designed by
B. Type of antifreeze used:
C. System type:
D. Pipe Material
E. Pipe Installed:
1.
Horizontal
No. pipes in trench
2.
Vertical

GROUND SOURCE HEAT PUMP

PERFORMANCE REPORT

Model #
Model #
Series
TAKEN BY:
S/N
Date Installed
Closed Loop System
% Solution
Parallel
Nominal Size
Total length of pipe
Depth bottom pipe
Total length of bore hole
P/N
ft
ft
ft
Manual
2100-532G
Page
47 of 48
Manual 2100-577C
Page
49 of 50

Advertisement

Table of Contents
loading

Table of Contents