Mounting Intermediate Panels/Frames - Wolf CFK-1 Installation, Operating And Maintenance Instructions

Rooftop installation with aluplus installation system, roof integration flat roof installation with aluplus installation system. high performance solar collector.
Table of Contents

Advertisement

Installation of the
intermediate panels
Flashing tape
Create a fold
26
14. Roof integration, slate roof
Intermediate panel
1. Push in the intermediate panels as per diagram. If this should jam during the
installation, correct the collector position. Then bend the tabs over at the top of the
intermediate panels to prevent them from sliding through.
2. Tighten all screws and nuts to secure the collector.
3. Pull off all the protective foil from the flashing tape and affix it to the tiles. Create a
fold at the ends of the flashing tape bases on the left and right.
Tabs
Intermediate panels
Fold
3062815_0110

Advertisement

Table of Contents
loading

Table of Contents