Testing A Project - Siemens SIMATIC KP400 Comfort Operating Instructions Manual

Hmi devices comfort panels
Table of Contents

Advertisement

5.5.3

Testing a project

Introduction
There are two options to test a project:
● Test the project on the configuring PC
● Offline testing of the project on the HMI device
● Online testing of the project on the HMI device
Perform the tests, starting with the "Offline test", followed by the "Online test".
Note
You should always test the project on the HMI device on which the project will be used.
Check the following:
1. Check the correct layout of the screens
2. Check the screen navigation
3. Check the input objects
4. Enter the tag values
The test increases the certainty that the project will run error-free on the HMI device.
Requirement for offline testing
● The project has been transferred to the HMI device.
● The HMI device is in "Offline" mode.
Procedure
In "Offline" mode, you can test individual project functions on the HMI device without them
being affected by the PLC. PLC tags, therefore, are not updated.
Test the operating elements and visualization of the project as far as possible without
connecting to the PLC.
Comfort Panels
Operating Instructions, 03/2012, A5E03404994-02
You can test a project at a configuring PC, using a simulator. You can find more detailed
information on this in the online help of WinCC.
Offline testing means that communication between the HMI device and PLC is down
while the test is being carried out.
Online testing means that the HMI device and PLC communicate with each other during
testing.
Commissioning a project
5.5 Transfer
143

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents