Heico-Lock Installation Guidlines; Maintenance - Cooper Crouse-Hinds Pro AFP Series Instruction Manual

Led inset runway guard light faa, 8-inch aluminum optical housing with ductile iron support ring
Table of Contents

Advertisement

9.2
Heico-lock Installation Guidelines (2014)
Step 1: Hand tighten to ensure that 2-3 threads extend beyond the nut on through-bolt applications.
Step 2: Tighten each bolt to one-third of the final required torque following the pattern as shown
below.
Step 3: Increase the torque to two-thirds following the pattern shown below.
Step 4: Increase the torque to full torque following the pattern shown below.
Step 5: Perform one final pass on each bolt working clockwise from bolt 1, at the full final torque.
10

Maintenance

The preferred method of maintaining these lights is to periodically and systematically replace the units
and return them to the maintenance shop for renovation. As an alternative, the units can be serviced in the
field. However, it is recommended that field servicing be limited to checking bolt torque per section 9.1
and cleaning the lens only as described in Section 10.3.
NOTICE
The warranty is void if the screws holding the L852G optical housing to the
WARNING
Instruction Manual
PRO AFP Series LED
Inset Runway Guard Light L-852G
The warranty is void if other than Crouse-Hinds Airport Lighting Products
parts are used to re-lamp or rebuild the light unit.
inner cover are loosened or removed.
NOTICE:
WARNING:
11
DOCUMENT 1331
REV. A

Advertisement

Table of Contents
loading

This manual is also suitable for:

L-852g

Table of Contents