2.2 Mechanical installation

1. The MBP support two installation modes: Tower installation and rack installation.
When MBP is installed together with UPS and EBM, please put the MBP on
top/left to connect the cable (as shown below)
Rack installation
2. To keep the system ventilated, keep at least 500mm between the front and rear
panels of the module and the wall or other equipment.
3. Do not carry the front/rear panel of the module during installing.
Rack mount (Installation steps same as the UPS module):
The MBP is suitable for installation in a 19-inch standard rack cabinet. It is
recommended that the depth of the cabinet be no less than 800mm.
4.
Install the rail kit(This is an optional configured). This rail kit is '2U & with
screw holes (M5)', the depth of the rail kit is: 415-763mm.
55
Tower installation