IBM 5294 Setup Procedure page 54

Hide thumbs Also See for 5294:
Table of Contents

Advertisement

Contact your system operator and report that you have
completed setup of the 5294 Control Unit and are ready
to establish communications with the system.
14.13.
~
_
Setup is complete.
)
For information on how to establish communications between
the 5294 and a host system, see Chapter 2 in the IBM 5294
Operator's Guide.
Save this manual and the completed IBM 5294 Setup Form. They will be needed
when additional work stations are attached or if the 5294 is relocated.
Chapter 4. Communications Line Connection
45

Advertisement

Table of Contents
loading

Table of Contents