Download Print this page

Carrier 59SE5A Installation, Start-Up, Operating And Service And Maintenance Instructions page 54

Single stage 4-way multipoise condensing gas furnace 22vac 50 hz series 100

Advertisement

/
Ventilated Combustion
//
Air intake pipe
_U
-"19-_
Pipe hangar
_
_
_
_
R"
[7_
mm
_,
Ventilated Combustion Air
12" (305 mm)
intake termination in crawl
space
CRAWL SPACE
Vent through
roof flashing
Ventilated Combustion
Air intake pipe
ff
12" (305 ram) rain. above
highest level of insulation
ATTI C
Fig. 50 - Vent Terminations
for Ventilated
Combustion
Air
A10497
54

Advertisement

loading