Download Print this page

Carrier 59SE5A Installation, Start-Up, Operating And Service And Maintenance Instructions page 42

Single stage 4-way multipoise condensing gas furnace 22vac 50 hz series 100

Advertisement

4.Locate a ssembly
through
sidewall
with
rain shield
posi-
tioned
no more than 1-in.
(25 ram) from wall as shown
in
Fig. 48.
5. Disassemble
loose
pipe fittings.
(?lean
and cement
using
same procedures
as used for system
piping.
DO NOT
CE-
MENT
POLYPROPYLENE
FITTINGS.
2-Pipe and 1-Pipe
Vent
Termination
NOTE:
Follow the instructions
of the vent ternfinal
manufacturer.
These instructions
are provided
as a reference,
only,
RECOMMENDED
SUPPORT
FOR VENT
TERMINATIONS
It is recommended that sidewall vent ternfinations in excess of
24 inches (0.6 M) in vertical length be supported by EITHER
the Direct Vent Ternfination Kit shown in Table 12 or by
field-supplied
brackets or supports fastened to the structure.
Deternfine
an appropriate
location
for ternfination
kit using the
guidelines
provided
in section
"Locating
The Vent Ternfination"
in
this instruction.
1. Cut two holes, one for each pipe, of appropriate size for
pipe size being used.
2. Loosely install elbow in bracket (if used) and place as-
sembly on combustion-air
pipe.
3. Install bracket as shown in Fig. 48.
NOTE:
For applications using vent pipe option indicated by
dashed lines in Fig. 48 and 49, rotate vent elbow 90 ° from
position.
4. Disassemble loose pipe fittings. Clean and cement using
same procedures as used for system piping.
DO NOT CE-
MENT POLYPROPYLENE
FITTINGS.
(Direct
Vent / 2-Pipe
System
ONLY)
When two or more furnaces are vented near each other, two vent
ternfinations may be installed as shown in Fig. 48, but next vent
ternfination, or pair of vent ternfinations,
nmst be at least 36 in.
(914 ram) away from the first two ternfinations. It is important that
vent ternfinations
be made
as shown
in Fig. 48 to avoid
recirculation of vent gases.
Table
13 - Approved
Combustion-Air
ASTM SPECIFICATION
(MARKED ON MATERIAL)
MATERIAL
PIPE
D1527
ABS
Pipe
D1785
PVC
Pipe
D2235
For ABS
--
D2241
PVC
Pipe
D2466
PVC
--
D2468
ABS
--
D2564
For PVC
--
D2661
ABS
Pipe
D2665
PVC
Pipe
F438
CPVC
--
F441
CPVC
Pipe
F442
CPVC
Pipe
F493
For CPVC
--
F628
F656
F891
ABS
Pipe
For PVC
PVC
Pipe
and Vent Pipe, Fitting
and Cement
Materials
(U.S.A.
Installations)
FITTINGS
Fittings
Fittings
Fittings
Fittings
Fittings
SOLVENTCEMENT
AND PRIMERS
Solvent
Cement
Solvent
Cement
Solvent
Cement
Primer
DESCRIPTION
Schedule-40
Schedule-40
For ABS
SDR-21 & SDR-26
Schedule-40
Schedule-40
For PVC
DWV at Schedule-40
IPS sizes
DWV
Schedule-40
Schedule-40
SDR
For CPVC
Cellular Core DWV at Schedule-40
IPS
sizes
For PVC
Cellular Core Schedule-40
& DWV
42

Advertisement

loading