The base of the unit has structural steel between the floor
of the unit and the curb sealing surface. For plenum curb
applications, exta insulation and sealing is required. Consult
Figure 23: Typical Power Wire Entrance, Curb View, See Project Certified Drawings
IM 1287 • REBEL APPLIED ROOFTOP
the factory before application with a plenum curb. Refer to
Figure
22.
20
Installation
Power Wire Entrance (route
wires up from bottom, and route
through provided patch plate)
www.DaikinApplied.com