Repair; Before Beginning Repair; Pumpline Disassembly - Graco Reactor 2 H-30 Repair Parts

Hydraulic proportioning systems
Hide thumbs Also See for Reactor 2 H-30:
Table of Contents

Advertisement

Repair

Repair
Repair
Repair
Repairing this equipment requires access to parts
that may cause electric shock or other serious injury
if work is not performed properly. Be sure to shut
off all power to equipment before repairing.
Before Beginning
Beginning Repair
Before
Before
Beginning
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage fluctuations that can damage
electrical equipment and void the warranty.
1. Flush if necessary. See
2. See
Shutdown, page
50
Repair
Repair
Flushing, page
49.
48.

Pumpline Disassembly

Disassembly
Pumpline
Pumpline
Disassembly
1. Follow the
Pressure Relief Procedure, page
2. Remove plug fitting (206) from lube cylinder
(205).
3. Insert clevis pin removal tool 296607 through
opening in lube cylinder (205) and screw tool into
left clevis pin (219). Pull clevis pin out of clevis
(117).
4. Use hex key to remove four socket head cap
screws (203) from left proportioning pump (202).
Remove left proportioning pump.
5. Remove lube cylinder (205).
6. Screw pin removal tool 296607 into right clevis
pin (219). Pull clevis pin out of clevis (117).
7. Use hex key to remove four socket head cap
screws (203) on right proportioning pump (202).
Remove right proportioning pump.
47.
334946H

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents