Switch Power On (Rear Panel); Led Indicators - Comtech EF Data MBT-5000A Installation And Operation Manual

L-band up/down converter system
Table of Contents

Advertisement

5.1.1

Switch Power On (Rear Panel)

Chapter 2. INSTALLATION
Chapter 3. REAR PANELCONNECTIONS
Before you turn on power to the unit, make sure that installation is complete, and verify that the
MBT-5000A is connected to the proper prime power source, RF Input, and RF Output. Refer to
Chapter 3. REAR PANEL CONNECTIONS for instruction on how to operate the rear panel.
Switch on the unit and verify the cooling fan is operational, the LED indicators illuminate as
expected, and the Vacuum Fluorescent Display is readable.
5.1.2

LED Indicators

LED
SUM FAULT
MUTE
ONLINE
UP
DOWN
Front Panel Operation
The operational condition of the MBT-5000A is represented by two
sets of five front panel LED indicators – one set each for Side A
and Side B.
STATE
WHEN LIT, THE DESIGNATED SIDE...
Red
...has active faults.
Amber
...is in Mute Mode.
Green
...is operational.
Green
...is operating as an Up Converter.
Green
...is operating as a Down Converter.
MBT-5000A L-Band Up/Down Converter System
5–3
Revision 1
MN-MBT-5000A

Advertisement

Table of Contents
loading

Table of Contents