Checks To Be Made On Delivery; Unloading The Unit; Characteristics Of The Installation Area; Positioning Of The Unit - Trane MERCURY EDAB 1105A Technical Manual

Mercury close control unit
Table of Contents

Advertisement

Checks to be made on delivery

WARNING! Dispose of the packaging in
appropriate collection points.
The Mercury units are packaged in wooden crates or
anchored to a pallet and covered in cardboard.
Check that the delivery is complete and inform the carrier of
any damage to the unit which may be attributed too careless
or inappropriate transportation. In particular, check any
eventual damage to the panel in which the user terminal is
mounted.
Lifting and moving the unit must be carried out by a
mechanical lifter, supplied with a sling made up of textile
belts, which, fixed under the machine, limits excessive stress
on the upper edges.
The following must be contained within the packaging:
• The Mercury unit;
• Mercury Use and Installation Manual;
• Mercury unit electrical diagrams;
• Mercury unit cooling circuit diagrams;
• Mercury unit installation diagrams;
• List of spare parts;
• CE declaration with a list of the European standards to
which the machine must conform;
• guarantee conditions

Unloading the unit

To unload the unit from the pallet, carry out the following
procedure:
move the pallet as near as possible to where the unit is
to be installed;
not tilt or turn the unit upsidedown;
use a ramp to avoid any damage to the unit during
unloading;
remove the blocking screws which fix the unit to the
pallet;
carefully push the unit along the ramp until it reaches
the floor.
PKG-SVX19B-E4

Characteristics of the installation area

WARNING! The unit must be installed internally
and protected from adverse conditions.
The unit is predisposed for installation on raised access
flooring using mounting frames or appropriate floor stands
supplied on request from Trane. However, the upflow units
(upwards air flow) with air intake through the rear or front can
also be installed on floors which are not raised.
The area of installation must have the following
characteristics:
to facilitate maintenance, leave a clearance (distance D)
of at least 700mm free in front of the unit. Check that the
air intake and discharge connections are not blocked in
any way, not even partially;
a horizontal and even floor;
the electrical energy distribution system has been
produced in respect of CEI standards, suitable for the
characteristics of the unit;
a cold water distribution implant (if a humidifier is to be
installed);
implant for connection to the condensing unit;
external air outlet (if a fresh air intake is to be
installed);
if or the refrigerating gas drain see paragraph
«Connection to gas drain»;
drainage system.
WARNING! The preparation of the installation
area must be carried out as indicated in the
installation drawing attached to the machine
documentation.

Positioning of the unit

WARNING! If the surface where the unit is
placed is not even and horizontal, there is a risk
of an overflow from the condensation tray. A
maximumheight difference of 5mm between the
ends of the unit is allowed.
Installation on raised access flooring
Installation on raised access flooring occurs by means of a
mounting frame. The frame enables the installation of the unit
before the raised floor is installed, increased absorption of
noise and vibrations and the facilitation of connecting ipes
and cables.
The upflow models (upwards air flow) with rear or frontal air
intake may be installed without using the mounting frame.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents