Chapter 1 Preparation; Applicable Models; Operation Flow Diagram - Mitsubishi Electric MELSEC iQ-F Series Quick Connection Manual

For cc-link ie field network basic
Hide thumbs Also See for MELSEC iQ-F Series:
Table of Contents

Advertisement

1
PREPARATION
1.1

Applicable Models

The models described in this guide are shown in the following table.
Programmable controller
FX5U CPU module
1.2

Operation Flow Diagram

1.
Preparing the required products
4.
Checking the communication
status
1 PREPARATION
5
1.1 Applicable Models
FX5UC CPU module
FX5UJ CPU module
2.
FR Configurator2
5.
Inverter (Ethernet model)
FR-E800-E
INVERTER SETTINGS
Ethernet
Program examples and checking the operation
When X24 is OFF, the instruction code H0FB is sent at the rising edge of X25 and the operation mode is changed to 2 (PU mode).
X25
X24
MOV
Operation
Operation
mode
mode
write
read
MOV
ExecuteCommandCode FB of the station number 1: Sending the instruction code to the station number 1
M_INVERTER_CC_IEF_Basic_ExecuteCommandCode_F_00A_1
ExecuteCommandCode
M280
B:i_bEN
o_bENO:B
Execution command
Execution command
Execution status
D0
W:i_wStationNo
o_bOK:B
Station number
Normal end
Station number
D280
W:i_wCommandCode
o_bErr:B
Instruction code
Failed end
Instruction code
D281
W:i_wWriteValue
o_wErrID:W
D290
Write value
Write value
Error code
Error code
o_wResultData:W
D291
Executing result
Executing result
M291
Normal end
FR-A800-E
3.
PROGRAMMABLE CONTROLLER
SETTINGS
H0FB
D280
Instruction code
K2
D281
Operation mode
SET
M280
Execution
command
M290
Execution status
M291
Normal end
M292
Failed end
RST
M280
Execution
command
END
FR-F800-E
Ethernet
Ethernet

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents