Plumbing Manifold - Worcester GREENSTAR 24i junior Instruction Manual

Wall hung rsf gas-fired condensing combination boiler installation, commissioning & service
Table of Contents

Advertisement

CH Flow 22mm
Mains Gas Supply 22mm
15

PLUMBING MANIFOLD

Gas Supply (alternative from above appliance) 22mm
DHW OUT 15mm
DHW IN (alternative from
above appliance)
15mm
Mains Water (DHW IN) 15mm
CH Return 22mm
*
A
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22mm compression fittings
DHW:
15mm compression fittings
Gas:
22mm compression fittings
Use the fittings supplied in the Lit/Hardware
pack.
• If the boiler pipes are to be run behind the
appliance ensure that the pipes pass through
the slot in the yellow plastic guide (A). This is
fitted to the boiler frame.
Further guidance on pipe routing can be
found printed on the boiler template
(supplied with the boiler).
8 716 107 336b (11/05)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 28i junior

Table of Contents