4
A
B
C
6.1
H
C
B
F
7
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
8 716 107 336b (11/05)
5
E
6
D
F
UNPACKING THE APPLIANCE
UNPACKING THE APPLIANCE
A - Outer carton
B - Inner sleeve (unwraps from front)
C - Packaging base
D - Protective wrapping
E - Appliance outer case
F
F - Protective inner packaging
4. Remove outer carton (A) and place
B
safely away from the working area.
5. With the outer packaging removed and
the inner sleeve (B) still in place gently
lay the boiler on its back.
F
6. The boiler will lie at an angle to the
C
floor to allow the boiler outer casing (E)
to be removed. The inner sleeve (B)
opens as shown. Remove the protective
wrapping (D) and undo the four screws,
two at the bottom of the boiler (H) and
two at the top (H) (see diagrams 6.1 and
6.2
6.2). Remove any packaging within the
boiler and the packaging base (C).
7. Stand boiler upright and remove the
protective inner packaging (F) at the rear
of the boiler.
H
CAUTION: Caps fitted to pipes must be
removed before hanging the boiler.
UNPACKING THE APPLIANCE
20