Condensate Pipework - Worcester GREENSTAR 24i junior Instruction Manual

Wall hung rsf gas-fired condensing combination boiler installation, commissioning & service
Table of Contents

Advertisement

11

CONDENSATE PIPEWORK

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
CONDENSATE PIPEWORK
CONDENSATE PIPEWORK:
• The condensate pipe must be a minimum of
22mmØ plastic pipe.
• The condensate pipework must fall at
least 50mm per metre towards the outlet
and should take the shortest practicable
route.
• The pipework must follow one of the options
shown opposite into an internal serviceable
trap (min. 75mm) such as a sink/washing
machine) or discharge direct into a vent
stack (E) 450mm min. above pipe invert or
into a gulley (D) below ground but above the
water level.
• Use waterproof pipe insulation in exposed
positions and for external pipework.
I M P ORTANT: Ensure t here are no
blockages in the pipe run.
1 Internal sink/washing machine drain
2 Internal waste drainage system
3 Soil/vent stack
4 External drainage system
5 External condensate absorption point
A - Condensate from boiler
B - Sink
C - 22mmØ plastic condensate pipe
D - Gulley
E - Internal soil and vent stack
F - Serviceable waste trap (75mm min)
G - 300mm x 100mmØ sealed plastic tube
H - Ground level
J - Drainage holes 50mm from base of tube
(12mmØ at 25mm centres) facing away from
building
K - Limestone chippings
8 716 107 336b (11/05)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 28i junior

Table of Contents