Worcester GREENSTAR 24i junior Instruction Manual page 37

Wall hung rsf gas-fired condensing combination boiler installation, commissioning & service
Table of Contents

Advertisement

1.
A
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
8 716 107 336b (11/05)
1.1
B
2.1
C
2.2
INSPECTION AND SERVICE
1.2
Component Access
1. Removing outer case
1.
Remove bottom panel by pulling it forward
and off.
1.1 Undo and remove 2 screws (A) securing
boiler casing at the top of the appliance.
1.2 Undo but do not remove the 2 screws
(B) securing boiler casing at the bottom of
the appliance.
1.3
1.3 Pull case forward and remove.
2. Adjusting boiler control to
service position
2.1 Remove screw (C) securing control.
2.2 Gently pull forward until it comes to
rest in service position.
Primary Heat Exchanger
There is a special accessory kit available
specifically designed for cleaning the
heat exchanger. If required order
7 716 192 312.
3
Check fan pressure at the test point next to
the fan using an electronic manometer.
The boiler must be run at maximum output.
Pressure will read negative and be greater
than:
Natural gas
24i junior - 3. 1 mbar
24i junior - 3.6 mbar
28i junior - 3.9 mbar
28i junior - 4.6 mbar
Pressures measured below these figures
will indicate that the heat exchanger will
require cleaning.
INSPECTION AND SERVICE
LPG
36
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 28i junior

Table of Contents