Cable Assembly - Weider WESY2916.1 User Manual

Weider user manual weight system wesy2916.1
Hide thumbs Also See for WESY2916.1:
Table of Contents

Advertisement

Cable Assembly

19. See the CABLE DIAGRAMS on page 28 to identi-
fy the cables as you assemble them.
Identify the Butterfly Cable (50). Grease an
M8 x 22mm Shoulder Bolt (90). Attach the Cable to
the Left Butterfly Bracket (28) with the Shoulder Bolt
and an M8 Nylon Locknut (78). Make sure the flat
edge of the Cable is against the Butterfly Arm.
Do not overtighten the Shoulder Bolt; the Cable
must be able to pivot freely.
20. Wrap the Butterfly Cable (50) over a "V"-pulley
(47). Attach the "V"-pulley, a Long Cable Trap
(57), an M10 Washer (80), and two Guards (54)
to the Upright (2) with an M10 x 60mm Bolt (79)
and an M10 Nylon Locknut (77).
21. Wrap the Butterfly Cable (50) under a 90mm
Pulley (48). Attach the Pulley and two Half
Guards (55) to the Double "U"-bracket (61) with
an M10 x 45mm Bolt (86) and an M10 Nylon
Locknut (77). Make sure the Half Guards are
oriented as shown.
19
Flat Edge
20
21
86
15
Grease
90
50
28
78
77
54 50
2
57
54
80
47
50
48
77
55
61
55
79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3130

Table of Contents