Controller canister
Controller canister
4. Move the cam handle to the left to lock the controller canister in place.
5. Reconnect all the cables.
What to do next
Go to
Place controller offline
Place controller online (duplex)
Place the controller online to confirm the storage array is working correctly. Then, you can collect support data
and resume operations.
About this task
Perform this task only if your storage array has two controllers.
Cam handle
Cam handle
(duplex).
| Batteries |
11