Screed Box Thermolazer 300Tc/Promelt; Installation; Removal - Graco ThermoLazer 200 Operation

Pavement marking systems
Hide thumbs Also See for ThermoLazer 200:
Table of Contents

Advertisement

Screed Box ThermoLazer 300TC/ProMelt (SmartDie II)
Screed Box ThermoLazer 300

Installation

Use extreme caution when installing and removing
screed box. Expect all equipment components and
material to be extremely hot. See MSDS for Thermo-
plastic Traffic Marking Compound.
1. Shut off screed box burners.
ti16833a
2. Slide screed box under screed shroud and press
down on screed box lever.
3. Engage screed box rod into screed box lever.
4. Align hole of rod clevis with connecting hole in
screed box yoke and install hairpin cotter pin.
26
ti16846a
ti14268a
/ProMelt (SmartDie II)
TC
5. Close and lock screed shroud door.
6. Re-light screed box burners as required (see
Screed Box Burner Lighting, page 21).

Removal

1. Shut off screed box burners.
ti16833a
2. Remove hairpin cotter pin connecting screed box to
rod clevis.
3. Press down screed box lever.
4. Disengage screed box rod from screed box lever
and carefully remove screed box.
ti17300a
ti17300a
ti16839a
3A1319K

Advertisement

Table of Contents
loading

Table of Contents