Perkins 1106D Troubleshooting Manual page 141

Electric power generation
Table of Contents

Advertisement

KENR6201-01
Illustration 47
Typical schematic of the circuit for the fuel rail pump solenoid
Illustration 48
Typical view of the pin locations on theP2 connector for the fuel rail pump solenoid
(25) Fuel rail pump solenoid PWM signal
Test Step 1. Inspect the Electrical
Connectors and the Harness
Electrical shock hazard. The fuel rail pump sole-
noid uses 63 to 73 volts.
A. Turn the keyswitch to the OFF position.
B. Thoroughly inspect the harness connector
P2/J2 and the suspect connector P532. Refer to
Troubleshooting, "Electrical Connectors - Inspect"
for details.
C. Perform a 45 N (10 lb) pull test on each of the
wires in the solenoid connector P532 and the
connector pins 25 and 26 that are associated with
the fuel rail pump solenoid. Refer to illustration 48.
This document is printed from SPI². Not for RESALE
(26) Fuel rail pump solenoid return
D. Check the harness for abrasions and for pinch
points from the battery to the ECM. Check the
harness for abrasions and for pinch points from
the key switch to the ECM.
E. Use the electronic service tool in order to perform
a "Wiggle Test". The "Wiggle Test"is used to
identify intermittent connections.
Expected Result:
All connectors, pins, and sockets are completely
coupled and/or inserted. The harness is free of
corrosion, of abrasion, and of pinch points.
Results:
OK – The connectors and the harness appear to
be OK. Proceed to Test Step 2.
141
Troubleshooting Section
g01803553
g01803554

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents