Jøtul Lillehammer Installation And Operation Instructions Manual page 29

Direct vent gas stove pilot-on demand ignition
Table of Contents

Advertisement

CAUTION!
THE BRICK PANELS ARE EXTREMELY FRAGILE.
HANDLE WITH CARE. WEAR SAFETY GLOVES TO
PROTECT HANDS.
1. Remove the Top Plate. Simply lift it up off of the
stove body. It is not fastened.
2. Remove the Glass Frame. Disengage the two trunk
latches located at the top of the firebox and lift the
glass frame up and out of the firebox.
3. If installed, remove the Logset.
These parts are not fastened. Simply lift them out of
the firebox. You do not have to remove the embers.
4. Install the Lower Panel.
Position it up against the back wall, resting on the
Burner Skirt. Fig. 43.
5. Install one of the Side Panels, pushing it up against
the firebox wall. Fig. 44
6. Position the Upper Panel. You should seat the Upper
Panel down and forward so that no gaps are evident
at the panel joints, as in Fig. 44.
7. Install the other Side Panel while holding the Upper
Panel in position.
Adjust the panels so that the mortar joints align
with those adjacent.
8. Install the Logset. Refer to pg. 20.
BE CERTAIN THAT NO EMBERS ARE BLOCKING THE
PILOT ASSEMBLY OPENING.
9. Replace the Glass Frame.
Slide the frame down the slot in the front of the
firebox. Be sure to push the frame into the slot in the
bottom to ensure it is fully seated. The gasket at the
top of the frame should be flush with the top of the
firebox.
Re-engage the trunk latches with the top lip of the
glass frame.
10. Replace the Top Plate.
Tools Required: Safety glasses and gloves
Upper Panel 221117
Left Panel
221114
Lower Panel 221116
Figure 42. Brick Panel Kit Contents.
Burner
Figure 43. Install the Lower Rear Panel
Figure 44 . Install the Upper and Side Panels.
139955-01_ GF 200 DVII MV / Sept. 2019
Right Panel
221115
Skirt
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gf 200 dv ii mvGf 200 dv ii mv lillehammer

Table of Contents