GE MAC 600 SPY Service Manual page 79

Table of Contents

Advertisement

Step
Earth Leakage Current
1
Forward Polarity
2
Neutral Open, Forward Polarity
3
Neutral Open, Reverse Polarity
4
Reverse Polarity
Patient Leakage Current To Ground
1
Forward Polarity
2
Neutral Open, Forward Polarity
3
Ground Open, Forward Polarity
4
Ground Open, Reverse Polarity
5
Neutral Open, Reverse Polarity
6
Reverse Polarity
Ground Resistance
AC mains power cord ground prong
1
to exposed metal surface (ground lug) N/A
Revision G
Maintenance: Check out Procedure
Verify the current leakage test results meet the requirements. Perform
electrical safety checks when indicated. All indicated electrical safety
checks require a pass/ fail indication for the steps performed. Record the
measurement values in your debrief.
1. Verify the equipment does not propose any health hazard. See
Leakage (AC line) Current Test"
Current Tests"
on page 4-26, for more information.
2. Verify all exposed metal is properly grounded. See
Resistance Test"
on page 4-24 for more information.
Table 5. Electrical Safety Checks
Condition
NC
_______uA
SFC
_______uA
SFC
_______uA
NC
_______uA
NC
_______uA
SFC
_______uA
SFC
_______uA
SFC
_______uA
SFC
_______uA
NC
_______uA
_______Q
NC = Normal Condition; SFC = Single Fault Condition; N/A = Not
Applicable
UUT = Unit Under Test
TM
MAC
600
2047426-002
on page 4-25 and
UUT - ON
Result
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
Pass/Fail
"Earth
"Patient Leakage
"Ground
Leakage Current Limits
150 uA
1000 uA
1000
uA
150
uA
10
uA
50 uA
50 uA
50 uA
50 uA
10
uA
Less than 1 Ohm
4-29

Advertisement

Table of Contents
loading

Table of Contents