Immediate Regeneration; To Advance Regeneration Cycles; Operation During A Power Failure - Pentair FLECK 5800 LXT Installer Manual

Hide thumbs Also See for FLECK 5800 LXT:
Table of Contents

Advertisement

Installer manual Fleck 5800 LXT - Operation
ð The regeneration starts on the scheduled time. See Softener time clock delayed
programming [
ð The service icon flashes.
Tip
To cancel: press
8.5.2

Immediate regeneration

1. Press and hold
from the programmed regeneration control type.
8.5.3

To advance regeneration cycles

1. Press
to pass to the next regeneration cycle.
8.6

Operation during a power failure

• Current valve position, cycle step time elapsed, and time of day is stored 24 hours during a
power failure, and will be restored upon power restoration;
• in regeneration, when power is shutting down, the controller saves the current regeneration
data. When power is restored, the controller resume the regeneration cycle at the point
where power failed;
Caution - material
Without power, the valve stay in its current position.
The valve system should include all required safety components to prevent overflows.
• all the program settings are stored in a permanent memory;
• time is kept during a power failure and the time of day is adjusted upon restoration of the
power (as long as the power is restored within 24 hours);
• the time of day on the main display screen will flash when there has been a power failure;
• the flashing of the time of day can stopped by pressing any button on the display.
60 / 96
Page 52].
again. The service icon stop flashing.
for 5 seconds to initiate immediately a manual regeneration, regardless
Ref. MKT-IM-005 / F - 30.04.2020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents