SLAVE UPS Setting Procedure

*The setting for MASTER UPS is unnecessary.
CAUTION
1. Supply the AC input and the Bypass input voltage to the UPS.
Initialization will start. Under initializing, the UPS will automatically:
-
Turn on contactor CB1;
-
Initialize converter operation;
-
Initialize inverter operation;
After initialization, LCD screen should appear.
(Refer to the SERVICE MANUAL, 6-1. SMS Start-up Procedure for details.)
2. Press the "MAINT" button located on the SW1 PCB (DPAU-81*).
Maintenance screen will appear.
3. Press the "SETUP" tab on the Maintenance screen, then press the "INPUT PORT" button.
4. Press the "IN4" button, and select item "9: ANOTHER BUS. SYNC." by pressing
"
" key then press "OK" button.
1. As the "IN4" default setting, it may be "POWER DEMAND".
2. Before making a change of the "IN4" setting, make sure that the POWER DEMAND
ATTENTION
5. Press the "CLOSE" button, and confirm that "9: ANOTHER BUS. SYNC." is lay out.
6. Press the "MAINTENANCE" tab, then press the "MAIN MENU" button for completion of SLAVE UPS
SETTING.
G9000 80-225kVA TOSHIBA SYNC KIT Installation Manual – 94469-001
1. Before the UPS setting, install the metal cover plates for the UPS.
2. Keep door closed except when the "MAINT" button located on the
SW1 PCB (DPAU-81*) is pressed.
function is defunct.
(Contact Toshiba International Corporation, if POWER DEMAND function is under service.)