Figure 6-1: Installation Procedure For Slave Ups (2) - Toshiba G9000 Series Installation Manual

Sync kit
Hide thumbs Also See for G9000 Series:
Table of Contents

Advertisement

Part No. 5
Four (4) Supporters
* Use part No.14, No.15
Four (4) flat washers
Four (4) spring washers
Part No. 3
Three (3) Fuses
Part No. 4
Fuses holder
* Use part No.12
two (2) screws (M4) with spring washer
and flat washer for the Fuse holder
Part No. 8
Wire
UN - V
VN - W
WN - U
Part No. 7
Wire (3-twisted)
U - U
V - V
W - W
G9000 80-225kVA TOSHIBA SYNC KIT Installation Manual – 94469-001
Figure 5-a. Installation procedure for SLAVE UPS (1)
To UP1 PCB (UPGR-M*)
CN1
U
A
V
B
W
C

Figure 6-1: Installation procedure for SLAVE UPS (2)

Part No. 2
Mounting Metallic Plate
Part No. 16
Fuse label
Part No. 9
Wire
* Use part No.11
one (1) screw(M3) with spring washer
and flat washer for grounding.
Part No. 1
VS1 PCB (VSAU-16*)
* Use part No.11
four (4) screws(M3) with spring washer
and flat washer for VS1 PCB.
From MASTER UPS