Siemens SINAMICS SM150 Operating Instructions Manual page 146

Medium-voltage drive
Table of Contents

Advertisement

Maintenance
9.5 Repair
9. Fasten the four eyebolts
10.Lift up the phase module and put it to one side.
11.Now lift the new phase module in the same manner from the transport packaging. Place the
See also
Attaching the changing device to the stacker (Page 138)
Installing a phase module
Installing the module
1. Install the intact module in the reverse order of the previously described steps.
2. When tightening the screws, make sure that you use the appropriate torque (Page 133)
3. Tighten the joints between the water pipes by hand.
Performing final checks
1. Open the valves.
2. Make sure that the connections are tight.
3. Make sure that the flow is ensured once the re-cooling unit has been switched in.
146
the eyelets on the fork.
phase module on the changing device.
permissible for each screw type.
on the phase module. Position the stacker so that you can hang
SINAMICS SM150 6SL3845-7NN42-2AA3 HBIS Shigang WRM NTM
Operating Instructions Rev.202003051222 3005356504

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents