Installing The Supervisor In The Cisco Cbr Chassis; Installing The Supervisor 160G; Installing The Supervisor Pic In The Cisco Cbr Chassis - Cisco cBR Series Hardware Installation Manual

Converged broadband routers
Hide thumbs Also See for cBR Series:
Table of Contents

Advertisement

Installing the Supervisor in the Cisco cBR
Chassis
This section provides information on installing the Supervisor.
Check if your hardware might have a supervisor card. For supervisor cards that are shipped as a spare module,
the supervisor card bootflash would be empty. Ensure that you manually copy the image on the bootflash to
avoid issues while booting.

Installing the Supervisor 160G

Installing the Supervisor PIC in the Cisco cBR Chassis

Perform this procedure to install the following PICs:
• Supervisor PIC
• Blank PIC for the Supervisor
Before you begin
Warning
If you are adding a new Supervisor PIC or upgrading the existing Supervisor PICs, ensure that the power
modules installed in the chassis are adequate to support the Supervisor PICs.
• Attach an ESD-preventive wrist strap to your wrist and connect the other end to the grounding lug
• Be aware of the weight and size of the equipment. Handle it with care.
Restrictions
• If you are using a single Supervisor, you must install the Supervisor PIC in the slot corresponding to the
Installing the Supervisor 160G, on page 89
Installing the Supervisor 250G, on page 109
connected to the chassis.
Supervisor Card.
C H A P T E R
Cisco Converged Broadband Routers Hardware Installation Guide
6
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbr-8

Table of Contents