Power Connections; Ac Power Connections - Avaya Virtual Services Platform 7000 Series Installation Manual

Hide thumbs Also See for Virtual Services Platform 7000 Series:
Table of Contents

Advertisement

Figure 4: Installing the fan trays and power supplies
Next steps
Once you have installed the two fan trays and at least one power supply, you can install and
connect power to the switch.

Power connections

The following sections describe the steps to connect power sources to the switch. Depending
on your type of installation, perform the AC or DC power connection procedure.
Related topics:

AC power connections

Connecting AC power
DC power connections
Connecting DC power
AC power connections
To connect your switch to AC power you require an AC power cord that meets the requirements
of your local electrical code.
International power cord specifications
Refer to the following table for power cord plug specifications.
Voltage:
VSP 7000 installation
on page 21
on page 23
on page 24
on page 27
Power connections
July 2013
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsp 7000 series

Table of Contents