Ricoh Grand Kingfisher A245 Service Manual page 19

Hide thumbs Also See for Grand Kingfisher A245:
Table of Contents

Advertisement

26 September 1997
[A]
6. Turn the "B1" lever [A] counterclockwise to lower the transfer corona unit.
7. Remove the knob screw [B] and gently pull out the imaging unit [C].
Then place it on a clean sheet of paper.
8. Remove the cover [D] from the imaging unit (1 screw and 1 snap [E]).
9. Pour in the developer [F] evenly into the imaging unit. Then rotate the
outer gear [G] for one or two turns to distribute the developer as shown.
NOTE: When installing new developer or manually rotating the
development roller, always make sure to turn the gear in the
direction shown above. Also do not rotate the gear more than 3
turns to prevent damage to the unit.
10. Remount the cover on the imaging unit, and install the unit in the copier
(1 knob screw).
[B]
A245I502.wmf
[G]
[C]
[D]
17
INSTALLATION
[F]
[E]
A245I503.wmf

Advertisement

Table of Contents
loading

Table of Contents