Application Module X Installation; Placement; Grounding; Ac Power - Honeywell TotalPlant LCN System Installation

Table of Contents

Advertisement

12

APPLICATION MODULE X INSTALLATION

Section 12
Provides for the installation of the Application Module X.

12.1 PLACEMENT

The Application Module X can be placed where any other Five-Slot or Ten-Slot Module can
be placed.

12.2 GROUNDING

The Application Module X (Five-Slot or Ten-Slot) is grounded the same as an Application
Module in a Five-Slot Module with the logic ground connected to the Safety Ground.

12.3 AC POWER

Connect the ac power cords attached to the module to the ac power strip in an LCN Cabinet
or to the ac distribution box in a Universal Station or Universal Station X .

12.4 LCN CABLE CONNECTION

The LCN A and LCN B cables are connected as any other node in the system—see
Section 3.

12.5 ETHERNET NETWORK CONNECTION

The Media Access Unit (MAU) is mounted on the end of the 2 meter adapter cable
(Cabletron p/n 51191753-100A). The other end of this cable is connected to J6 on the
WSI2 I/O board in slot 2 of a Five-Slot Module or slot 6 of a Ten-Slot Module.
The MAU is connected to a Local Area Network (LAN) using BNC cable. The adapter
cable is necessary to avoid interference with the LCN A cable connection.
LCN System Installation
12-1
9/96

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents