Installations Of Ce Compliant Options; Overview - Honeywell TotalPlant LCN System Installation

Table of Contents

Advertisement

Appendix C – Installations of CE Compliant Options
C.1

Overview

Scope
Figure C-1
EDPGC I/O Faceplate
VIDEO
ATTENTION
Cables
Cabling diagrams and
tables
LCN System Installation
CE Compliant hardware consists of a special set of I/O boards, for each
control board type, that have a metal faceplate mounted to the edge of the
board that provides grounding for the shielded cables connected to the I/O
board. These boards are connected to the module chassis by a retaining
screw, located on the right and left ends of the faceplate.
Figure C-1 shows an EPDGC I/O board as an example of an I/O board and
the grounding screw locations.
SCSI
Grounding Screws
These screws must always be firmly into the I/O card file to provide the
required grounding.
Classic and ergonomic Universal Stations, Universal Station X s,
Micro TDC 3000s, and Universal Work Stations have a complete new set
of cables that connect the components in each application.
Each cabling application is shown in this appendix with each different cable
numbered for identification. Each number is listed in the table following the
diagram. Each entry in the table lists the part number and part identification
title. The part identification title is assigned for the first application of the
cable. A second usage of the same part may have a title not associated with
the application.
CURSOR
PRINTER
C-1
KEYBD
53638
9/96

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents