Honeywell TotalPlant LCN System Installation page 44

Table of Contents

Advertisement

Wiring the power in a Universal Station located in Classic furniture is shown in Figure 5-1
and Figure 5-2.
Console Power
Entry Box
ON
OFF
CB1
CB2
15 Amp Circuit
Breakers for115 V,
10 Amp for 230 V
Figure 5-1 — LCN Cabinet/Universal Station Power Entry Box
Console Power
Entry Box
ON
OFF
Figure 5-2 — LCN Cabinet/Universal Station Power Entry Box Wiring
LCN System Installation
Flush Receptacle
(115 V, 15 Amp Shown)
TB1 Access
Cover Removed
Conduit Opening
15 Amp Circuit Breaker
115 Vac
Customer
Connection - US
G L2 L1
Grn
Wht.
Blk
115 Vac
Customer
Connection - EC
G L2 L1
Yel/Grn
Lt. Blue
Brn.
5-2
Cabinet Power Entry Box
115 V Option Shown
(Top View, Cover Removed
Shock Hazard Trip
Breaker at Power
Removing Cover.
Cabinet Power Entry Box
230 Vac
Customer
(Top View, Cover Removed
Connection - US
G L2 L1
Grn
Blk
Blk
230 Vac
Customer
Connection - EC
G L2 L1
Yel/
Grn
Brn
Brn
5.2
FL1
DANGER
Panel Before
CB1
OFF
TB1
ON
CB2
53860
115 V Option Shown
FL1
DANGER
Shock Hazard Trip
Breaker at Power
Panel Before
Removing Cover.
CB1
OFF
TB1
ON
CB2
53861
9/96

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents