Console Complexing-Universal Station Furniture - Honeywell TotalPlant LCN System Installation

Table of Contents

Advertisement

3.4 CONSOLE COMPLEXING—UNIVERSAL STATION FURNITURE
Ensure that all cable access ports located at the front bottom right and left sides are open
before complexing. See Figure 3-1.
When the task of complexing the console is finished, close the cable access port on each end
of the console.
Cabinet Front
Figure 3-1 — Location of Cable Access Ports in a Universal Station
LCN System Installation
NOTE
Coax Cable
Channel
Shown in Open Position
3-3
3.4
11351
9/96

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents