Download Print this page

National Instruments SCXI-1121 Calibration Procedure page 5

Hide thumbs Also See for SCXI-1121:

Advertisement

1 Thumbscrews
© National Instruments Corporation
Refer to Figure 2 for an illustration of steps 3 and 4.
®
S C
X I
M A
IN
F R
A M
E
L
N A
T S
E N
T I O
N A
U M
T R
I N S
2
1
2 Slot 4
Figure 2. Side Plate Removal and Module Installation
The SCXI-1121 module does not need to be connected to a data acquisition
(DAQ) device. Leave the configuration of the digital jumpers W41–W45
and W46 unchanged because they do not affect this procedure.
Configuring the Half-Bridge Completion Jumpers
Verify that the half-bridge completion network is disabled prior to
calibrating the module. Refer to Figure 3 for the location of the jumpers and
Table 1 for the correct jumper settings to disable the network.
3 Side Plate
5
3
SCXI-1121 Calibration Procedure

Advertisement

loading