Install the devices of the system voltage-free and completely.
Proof the a-, b- and P-wire against each other on short-circuit.
Switch on the main voltage.
Hint:
If the floor push button is not working, proof, if it is connected to the a-wire of the power
supply and control unit.
Pre-adjusted times
communication time
flashing period of the green LED, if the voice
channel is busy after the voice communication
is established
internal standby time, if the device is calling or
is called
2-wire/3-wire opration
The jumper J1 is adjusted for the 2-wire
operation in delivered state.
2-wire operation (delivered state)
Put the jumper J1 at both contacts for the
3-wire operation.
3-wire operation
TCS TürControlSysteme AG, TCS Hotline Germany: +49 (0) 41 94/ 9 88 11 88
Mail: hotline@tcsag.de
10
Commissioning
Settings
max. 2 min
2 sec
around
30 sec
J1
3 x flashing
Subject to technical changes.
ISW3030-0140 UK
2 A
07/2015