4.
Press the "Enter" key.
Light sensor (ABP) calibration starts. During the calibration, a progress bar appears. The calibration
is complete once the progress bar has reached 100%.
ADC Calibration
After replacing the main boar, this calibration must be done.
VGA and Component signals require ADC calibration.
VGA RGB Calibration
Environment
• Test equipment: Video generator
• Test signal: 800 x 600 @72Hz
• Test pattern: Grays 16
• Input the signal from the VGA IN port
1.
Connect the video source and wait for the screen display.
2.
Get into service mode.
(page 78 "How to enter the Service
Mode")
Calibration
91