Installing Leveling Legs - True TBR Series Installation Manual

Hide thumbs Also See for TBR Series:
Table of Contents

Advertisement

TRUE
TBR | TDR SERIES
INSTALLATION

INSTALLING LEVELING LEGS

Leveling legs are provided to assist with the leveling of the cabinet.
With access to the bottom of the cabinet, thread the leveling leg
into hole used to secure the cabinet to the skid.
The leveling legs may be threaded in or out to achieve a level and
supported cabinet.
INSTALLING LEVELING LEGS & CASTORS
TOOLS REQUIRED
• 1/2" socket wrench
Optional platform castors will provide cabinet mobility.
Locate the anchor points for the plate castors. Install each plate cas-
tor using the 1/2" socket wrench with hex head bolts and washers.
NOTE:
• Do not over tighten the bolts.
• Verify level of the cabinet. If cabinet is not level, gently lift
and support the low end of the cabinet.
• Loosen the castor bolts enough to slide the provided castor
shims between the castor mounting plate and the bottom
of the cabinet.
• Install the desired number of shims in pairs, making sure the
slots in the shims are in contact with the castor mounting
bolts (see images, right).
• Tighten and secure the shims and castors.
• Lower the cabinet and verify level.
• Repeat process until cabinet is level.
(CONT.)
LOCATING
Carefully upright cabinet.
A.
Ensure that the drain hose or hoses are positioned
B.
in the pan.
Free plug and cord from inside the lower rear of the cooler
C.
(do not plug in).
The unit should be placed close enough to the electrical
D.
supply so that extension cords are never used.
LEVELING
Proper leveling of your TRUE cooler is critical to operating success
(for non-mobile models). Effective condensate removal and door
operation will be effected by leveling.
The cooler should be leveled front to back and side to side
with a level.
Position level in the inside floor of the unit near the doors
A.
(level should be parallel to cabinet front). Level cabinet.
Position level at the inside rear of cabinet (again, level should
B.
be placed parallel to cabinet back). Level cabinet.
Perform similar procedures to Steps A and B by placing the
C.
level on inside floor (left and right side, parallel to the depth
of the cooler). Level cabinet.
If the cabinet has a center leveling screw, castor, or leg,
NOTE:
make sure it is adjusted properly so it makes full contact
with the floor after the cabinet has been leveled.
truemfg.com
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents