Mitsubishi LE-30CTN Instruction Manual page 59

Tension controller
Table of Contents

Advertisement

13. EC Directives (CE Marking)
Connection example for EMC
Control box
(Door is closed.)
(Ferrite core)
Conduit
(Grounding ring)
(Ferrite core)
Tension detector
LX-
TD
ZKG-
AN(POWDER CLUTCH) ×1
LE-
TD(TENSION SENSOR) ×2
Tension controller
GRR
WHR
SG
LE-30CTN
RED
BLK
RED
BLK
SG
GRL
WHL
PP PN
MI1 MI2 MI3
(Grounding ring)
Conduit
Conduit
2-lead cable
DC24V,3A
(Grounding ring)
Powder
clutch/brake
Tension detector
LX-
TD
Terminal block
ZKG-
AN
PLC
FX2N-
L N
Y0 Y1 Y2 Y3 24V24V 0V
(Torque monitor)
TOUT
AOC
(Torque monitor)
AO1
AOC
ZT
ZT
RUN
MIC
L N
NFB
Bus bar
Line filter
RSHN-2006
(Grounding ring)
Ground
strap
Conduit
Conduit
3-lead power supply
cable
Earth
AC230V
INPUT
7 wires signal cable
DC12V,10mA
(Grounding ring)
,
Control box
(*Door is open.)
Bus bar
(Grounding ring)
0.5m
Ground
(*Door is open.)
strap
Conduit
In the control box for actuator and tension detector, its
door can be open depending on the grounding condition.
Earth
13.4 Measures for EMC
Analog unit
MR-ES/UL
FX2N-
AD
CH1
24V 0V
V+ VI- V+ VI-
(No fuse breaker)
(TDK-Lamda)
Grounding ring
Ferrite core
TFCM-41-27-16
Conduit
(Flexible shield pipe)
CH2
(KITAGAWA)
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents