Avaya 120 Series Installing page 20

Converged platform
Table of Contents

Advertisement

Installation
2. Place the kit components within easy reach of your work area.
Important:
Rail kit installation is performed using either Step 3 or Step 4 depending on the type of
rails in use. Read each step carefully and consult your installation environment before
proceeding.
3. Perform the following actions to install toolless rails:
a. Position the left and right rail end pieces labeled FRONT facing inward and orient
each end piece to seat in the holes on the front side of the vertical rack flanges.
b. Align each end piece in the bottom and top holes of the desired rack spaces.
c. Engage the back end of the rail until it fully seats on the vertical rack flange and the
latch clicks into place.
d. Repeat these steps to position and seat the front end piece on the vertical rack flange.
December 2018
Installing the Avaya Converged Platform 120 Series
Comments on this document? infodev@avaya.com
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acp 120Acp 110Acp 130

Table of Contents